|
Client:
Board of Water Supply
Scope of Services: Prime Architect
Date of Completion: 1989
Floor Area: 24,330 SF
The 2-story water telemetry and laboratory building is located
in the Kahului Baseyard. The complex tests the islands
water for compliance with current health codes and monitors
the water flow.
The industrial architectural design, with the use of a parapet
metal trim roof and concrete block walls, of this building
blends in with the overall industrial language of the baseyard.
|
|

|